Following its gradual adoption, the paraseismic slabs with side indenting iHCS, enables the diaphragm action of rigid floors by additional friction at the longitudinal joints.
The industrialization of the concrete elements allows the quality materials assurance, the precision in the assembly, the speed of execution and the savings in the bill of materials.
The prestressed concrete slabs with side indenting are mentioned in the European Standards and has been described for more than 15 years on specialized publications.
The side indenting slabs are manufactured with the Tensyland casting Flowforming system and it can be used in different types of buildings such as car parkings, housing, offices, hotels, factories or shopping centers.
For more information concerning the Flowforming Tensyland system, please click here: